Changes between Version 2 and Version 3 of IETF87


Ignore:
Timestamp:
01/08/13 12:07:51 (9 years ago)
Author:
brian@…
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • IETF87

    v2 v3  
    2727
    2828The second session was held together with DHC.  The goal is to identify overlaps between the WGs and to raise awareness of both WGs about the related works.  The turn-off-ipv4 using dhcpv6 and RA draft, the DHCPv4 over DHCPv6 draft, the DHC v4 configuration draft and the DHCPv6 dynamic DNS reconfigure draft were discussed. The first one has been primarily discussed in sunset4 and the remaining have been primarily discussed in DHC.  No change were discussed on the status of the documents. The sunset4 turn-off-ipv4 using dhcpv6 and RA draft seem to raise no major issue from both groups and seems an acceptable approach. However concerns about the MIF case and security considerations need to be addressed. It will be most likely balloted in the sunset4 for WG adoption.
     29
     30== TRILL ==
     31The TRILL WG met in the last time slot on Tuesday. The initial review of
     32document and WG status also included a brief report on the recent TRILL
     33plugfest at the University of New Hampshire InterOperability Laboratory in
     34May, which lead to also discussing TRILL implementation reports. The
     35primary topic of the TRILL meeting was OAM. RFC publication of the OAM
     36framework document is being requested. The OAM Fault Management document is
     37now a WG document and personal drafts exist for Performance and OAM MIB.
     38There was considerable discussion concerning the fault management,
     39performance, and MIB drafts and a consensus in the room that, because the
     40current OAM efforts are based on IEEE 802.1 OAM, it is time to send a
     41formal liaison to IEEE 802.1 requesting their review of the framework and
     42fault management documents. The second topic of the meeting was TRILL
     43directory assisted edge, covering mechanisms and pre-encapsulation, which
     44were also discussed. Finally, there was a presentation on problems to be
     45overcome in active-active at the edge for which some discussion occurred
     46although the meeting had run a bit over time.