Timeline
08/01/21:
- 23:03 Ticket #30 (Endless Email Loops with Aggregate Reports) closed by
- worksforme: Not a problem in practice, closed.
02/01/21:
- 12:07 Ticket #93 (MLM problem) created by
- Adopt draft-vesely-dmarc-mlm-transform. The technique outlined in the …
- 11:55 Ticket #92 (Girl Scout troops vs MLM problems) created by
- Must add a section explaining that From: rewriting is used to …
31/12/20:
30/12/20:
- 21:02 Ticket #39 (Remove p=quarantine) closed by
- wontfix: Comments were very negative.
- 18:10 Ticket #91 (Revise Authentication-Results Result Registry Update) created by
- The current draft only specifies pass, fail, permerror, and temperror. …
- 17:52 Ticket #90 (DMARC should require a normative Authentication-Results Requirements ...) created by
- DMARC should require a normative Authentication-Results Requirements …
- 17:43 Ticket #89 (Should Authentication-Results be standards track?) created by
- It was pointed out that it's not clear whether Authentication-Results …
- 17:35 Ticket #88 (Authentication-Results is an orphan) created by
- The nebulous state of Authentication-Results process-wise causes an …
- 17:31 Ticket #87 (DMARC scaling issue) created by
- There is a scaling issue for DMARC if it is required to be used beyond …
09/12/20:
Note: See TracTimeline
for information about the timeline view.